AERCO BMK 1.5 LN June 2010 User Manual
Installation, operation & maintenance instructions, Gf-120
Printed in U.S.A.
REVISED JUNE 14, 2010
Instruction
No.
AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 USA
GF-120
Installation, Operation
& Maintenance Instructions
Benchmark 1.5LN
Series
Gas Fired
Low NOx
Boiler System
Condensing, Modulating
Forced Draft, Hot Water Boiler
1,500,000 BTU/H Input
Applicable for Serial Numbers G-10-1002 and above
Table of contents
Document Outline
- Table of Contents
- Foreword
- CHAPTER 1 - SAFETY PRECAUTIONS
- CHAPTER 2 - INSTALLATION
- CHAPTER 3 - CONTROL PANEL OPERATING PROCEDURES
- CHAPTER 4 - INITIAL START-UP
- CHAPTER 5 - MODE OF OPERATION
- CHAPTER 6 - SAFETY DEVICE TESTING
- CHAPTER 7 - MAINTENANCE
- CHAPTER 8 - TROUBLESHOOTING GUIDE
- CHAPTER 9 - RS232 COMMUNICATION
- APPENDIX A - BOILER MENU ITEM DESCRIPTIONS
- APPENDIX B - STARTUP, STATUS AND FAULT MESSAGES
- APPENDIX C - TEMPERATURE SENSOR RESISTANCE CHART
- APPENDIX D - INDOOR/OUTDOOR RESET RATIO CHARTS
- APPENDIX E - BOILER DEFAULT SETTINGS
- APPENDIX F - ASSEMBLY DRAWINGS
- APPENDIX G - PIPING DIAGRAMS
- APPENDIX H - WIRING DIAGRAMS
- APPENDIX I - RECOMMENDED PERIODIC CHECK LIST
- APPENDIX J - CONTROL PANEL VIEWS
- APPENDIX K - RECOMMENDED SPARE PARTS
- STANDARD WARRANTY