FEC FUSIONE-HS-2 User Manual
Page 11

Table of contents
i
Table of Contents
Page
Chapter 1: Outline
1-1
1.1 About This operations manual
1-2
1.2 Features
1-3
1.3 Functions.
1-5
1.4 System requirements
1-6
Chapter 2: Specifications
2-1
2.1 Main Specifications
2-2
2.2 Duty Cycle Calculation
2-3
2.3 Controller Unit Specifications
2-4
2.4 Capability.
2-5
2.4.1 Nutrunner Tool Specification Table.
2-6
2.4.2 Nutrunner Decimal Point Display Table.
2-7
Chapter 3: System Description
3-1
3.1 Controller
3-2
3.1.1 Controller Part Number Breakdown
3-2
3.1.2 Controller Front Panel
3-4
3.1.3 Controller Back Panel
3-5
3.2 Fusion Tool
3-7
3.2.1 Fusion Tool Part Number Breakdown
3-7
3.2.2 Fusion Tool Control, Displays and Connectors
3-8
Chapter 4: System Setup and Wiring
4-1
4.1 Design and Build Procedure
4-2
4.2 Component Dimensions
4-3
4.2.1 Controller Unit Dimensions
4-3
4.3 Unit Arrangement
4-4
4.4 Nutrunner (Tool) Dimensions
4-5
4.4.1 Straight Tool
4-5
4.4.2 Right Angle Tool
4-6
4.4.3 Pistol Tool
4-7
4.5 Connection Diagrams
4-9
4.6 Power Requirements and Connections
4-10
4.6.1 Controller Unit
4-10
4.7 Wiring PLC I/O
4-11
4.7.1 Explanation of Controller Unit I/O
4-12
4.7.2 Work / Parameter Select Table
4-13
4.7.3 Bank Select Table
4-14
4.7.4 Bank Output Servo Error Table
4-16
4.7.5 PLC Wiring Sample
4-17
4.8 RS-232 Data Communication Ports.
4-18
4.8.1 Front Panel DB9 PC Connection for AFC User Console Software
4-18
4.8.2 Rear Panel DB9 PC Connection (RS232)
4-19
4.8.3 Rear Panel RS232 Communication Protocol
4.20
4.8.4 Rear Panel RS232 Alternate Communication Protocol
4-24
4.8.5 Rear Panel RS232 Alternate Communication Protocol
4-25
4.9 Torque/Angle MON. DB9 (external monitoring connector).
4-26