9 - component power-up and configuration, Turning on ac power, 9 – component power-up and configuration – Gasboy CFN Series Site Controller III Start-up User Manual
Page 63

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008
Page 57
Turning On AC Power
Component Power-up and Configuration
9 – Component Power-up and Configuration
Turning On AC Power
Turn on the AC POWER for all system devices as follows.
Power Conditioner/AC Surge Protector Strip
Plug in device. Turn on power switch if applicable.
Monitor
Locate the AC power switch on the monitor and turn on. Refer to the operator’s manual for
monitor adjustments and Light Emitting Diode (LED) indicators.
Logger/Printer
Locate and turn on the AC power switch for the logger/printer. If using a Link terminal for
remote log-in, refer to the setup parameters later in this section.
CheckPoint or Profit Point
CheckPoint: Locate the AC power switch on the back side of the unit. Push the switch down to
the ON position marked 1. Verify if the console is on by observing the display on the front of
the unit. If the site has an optional customer display, verify if it is also working.
Profit Point: Locate the AC power switch on the front lower righthand side of the monitor and
the AC power switch on the back righthand side of the PPC. Push the switch for the monitor
into the ON position; then do the same for the console. Verify if it powers up.
SC
Locate the AC power switch on the front of the PC and turn it on. Some units may also have a
power switch in the back.
Verify if the SC is operating properly. Verify if power up message prints on monitor and/or
logger.
ICR
Locate the AC power switch inside the ICR assembly, upper righthand corner and turn it up to
the ON position. Verify if the two power supply LEDs (red) are lit. Verify if the two 485
communication LEDs (red), located on the upper lefthand corner of the reader CPU board, are
flashing.
PCU(s)
Locate AC power switch and battery switch and turn them on. Verify if the two power supply
LEDs (red) are lit. Verify if the two RS-485 communication LEDs (red) on the pump control
CPU board are flashing.