Gasboy CFN Series Site Controller III Start-up User Manual
Site controller iii start-up manual
This manual is related to the following products:
Table of contents
Document Outline
- CFN Series Site Controller III Start-up Manual
- Table of Contents
- 1 - Starting a Site Controller III System
- 2 - Important Safety Information
- 3 - Site Information
- Communication Port Settings
- Authorize Users
- Receipt Messages
- Broadcast Messages
- Load Product - Fuels
- Load Fuel Inventory
- Load Tank
- Load Prices
- Load Fuel
- Load Pumps
- Load Cutoff
- Load Tax
- Lockout Type
- Authorization and Limitation Codes
- CRON Commands
- Load Remote Host Phone Number
- Load Merchandise Prods/Depts
- Load Merchandise Inventory
- Load Price Lookup
- Profit Point Product Layout
- Profit Point Default Keyboard
- Worksheet for Pump/CRIND Device - PC Interface (if used)
- 4 - Begin Start-up Form
- 5 - Physical System Layout
- 6 - Jumpers and Switch Settings
- 7 - System Power
- 8 - Pump/Dispenser Manual Test
- 9 - Component Power-up and Configuration
- 10 - DC Power Measurement and Adjustment
- 11 - Communication Tests
- 12 - Pump/Dispenser Automatic Test
- ICR - Pump Activation Test (Optional)
- Profit Point or SC III/POS WS - Postpay Pump Activation Test (Optional)
- Profit Point or SC III/POS WS - Prepay Pump Activation Test (Optional when using Dual-stage Solenoid Valves)
- Before Using Fuel Point
- Fuel Point Setup for Ground Loop Fueling
- Fuel Point - Pump Activation Test
- Reader Entries and Fuel Point
- Obtaining a Receipt for Fuel Point Transactions
- Master/Satellite Dispensers with Fuel Point
- Using the Chain Pump Feature with Fuel Point
- Fuel Point - Gate Activation Test
- 13 - Start-up Commands
- Sign-on and Preliminary Steps
- Receipt Header, Broadcast Messages
- Load Fuel Products, Pumps, Tanks, Prices, and Taxes
- Card Lockout
- Card Authorizations, Limitations
- Load Merchandise/Departments, Prices, Inventory
- Enable Devices
- Cash Drawer, Shifts
- Optional Features
- Reset Transaction File
- Diagnostics and History
- Verification and Backup
- Site Data
- Release, Applications, and System Data
- Standalone Profit Point Setup
- SC III/POS WS Setup
- 14 - Customer Training
- 15 - Finish Start-up
- Gasboy Motor Fuel Management System
- CFN System Start-up Form
- 1. SITE IDENTIFICATION
- 2. SYSTEM IDENTIFICATION Site #: 1001
- 3. SYSTEM DESCRIPTION
- 4. COMMUNICATIONS
- 5. BREAKER NUMBERS
- 6. SYSTEM ENVIRONMENT
- 7. CONDUIT
- 8. SYSTEM POWER
- 9. DC POWER
- 10. SYSTEM APPROVALS
- 11. CUSTOMER KNOWLEDGE
- 12. ATTACH PRINTOUTS
- 13. PARTS USED
- 14. SITE LAYOUT (include wiring distances)
- Gasboy Motor Fuel Management System
- CFN System Start-up Form
- 1. SITE IDENTIFICATION
- 2. SYSTEM IDENTIFICATION Site #:
- 3. SYSTEM DESCRIPTION
- 4. COMMUNICATIONS
- 5. BREAKER NUMBERS
- 6. SYSTEM ENVIRONMENT
- 7. CONDUIT
- 8. SYSTEM POWER
- 9. DC POWER
- 10. SYSTEM APPROVALS
- 11. CUSTOMER KNOWLEDGE
- 12. ATTACH PRINTOUTS
- 13. PARTS USED
- 14. SITE LAYOUT (include wiring distances)
- Gasboy Motor Fuel Management System
- Index