beautypg.com

Pump control expmux cpu board – Gasboy CFN Series Site Controller III Start-up User Manual

Page 47

background image

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008

Page 41

PCU

Jumpers and Switch Settings

PCU

Figure 6-3

shows the PCU layout. Refer to this layout when performing steps

1

through

5

under

“Pump Control EXPMUX CPU Board”

.

Figure 6-3: PCU Component Location

Pump Control EXPMUX CPU Board

1

Unlock and open the front door of the PCU.

2

Ensure that all override switches are in the AUTO position. Refer to

Figure 6-3

.

3

Ensure that the AC power and battery switches, located in the upper righthand corner of the
power supply are turned OFF (down).

This manual is related to the following products: