beautypg.com

4 - begin start-up form, Parts 1 through 6, 4 – begin start-up form – Gasboy CFN Series Site Controller III Start-up User Manual

Page 35

background image

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008

Page 29

Parts 1 through 6

Begin Start-up Form

4 – Begin Start-up Form

Parts 1 through 6

This section covers Parts 1 through 6 of the Start-up Form. Parts 7 through 13 are covered in
subsequent sections. Refer to

“CFN System Start-up Form”

on

page 113

for a blank copy of

the Start-up Forms.

1. SITE IDENTIFICATION

Customer:

The name of the company that owns the system.

Contact:

The name of the person who will manage the site operation.

Customer Phone:

The phone number where the contact person can be reached.

Site Location:

The address of the site where the system is located.

Electrician:

The name of the person who did the wiring for the site.

Date/Time of Arrival:

Date and time of your arrival at the site.

Date/Time of
Departure:

Date and time you left the site.

Distributor/Phone:

The distributor involved with the sale of the system. Include phone number.

Installer/Phone:

The firm that installed the system. Include phone number

Start-up Person:

Your name.

Co. Name/Phone:

Your company name and phone number.

This manual is related to the following products: