4 - begin start-up form, Parts 1 through 6, 4 – begin start-up form – Gasboy CFN Series Site Controller III Start-up User Manual
Page 35

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008
Page 29
Parts 1 through 6
Begin Start-up Form
4 – Begin Start-up Form
Parts 1 through 6
This section covers Parts 1 through 6 of the Start-up Form. Parts 7 through 13 are covered in
subsequent sections. Refer to
on
the Start-up Forms.
1. SITE IDENTIFICATION
Customer:
The name of the company that owns the system.
Contact:
The name of the person who will manage the site operation.
Customer Phone:
The phone number where the contact person can be reached.
Site Location:
The address of the site where the system is located.
Electrician:
The name of the person who did the wiring for the site.
Date/Time of Arrival:
Date and time of your arrival at the site.
Date/Time of
Departure:
Date and time you left the site.
Distributor/Phone:
The distributor involved with the sale of the system. Include phone number.
Installer/Phone:
The firm that installed the system. Include phone number
Start-up Person:
Your name.
Co. Name/Phone:
Your company name and phone number.