Tank monitoring system (optional), Gilbarco pump interface using pc com port, Crind interface using pc com port – Gasboy CFN Series Site Controller III Start-up User Manual
Page 42: Fuel point components, Electronic pumps

Physical System Layout
Tank Monitoring System (Optional)
Page 36 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008
Tank Monitoring System (Optional)
1
Verify if the tank monitoring system is correctly connected to the SC according to
MDE-4298 SC III Installation Manual.
2
Refer to the tank monitoring system manufacturer’s installation instructions for specific
connection information.
Gilbarco Pump Interface Using PC COM Port
Install according to instructions outlined in MDE-4634 Gilbarco Pump PC Interface Manual.
CRIND Interface Using PC COM Port
Install as per instructions outlined in MDE-4337 Gilbarco CRIND PC Interface for Site
Controller III with Windows NT.
Fuel Point Components
1
Verify if all the Fuel Point components are installed according to the applicable Fuel Point
installation manuals (listed in section 1).
2
Ensure that the N-ring wiring between the Fuel Point Reader (FPR) and pre-amplifier is in
conduit separate from non-intrinsic safe wiring.
Electronic Pumps
All electronic pumps must be installed according to the manufacturer’s specifications. Ensure
that all interface connections are made according to the SC III Installation Manual or the Pump
Interface Manual.