beautypg.com

Dc power, System approvals, Customer knowledge – Gasboy CFN Series Site Controller III Start-up User Manual

Page 116: Attach printouts, Parts used, Sample form

background image

Gasboy Motor Fuel Management System

Page 110

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008

Sample Form

Sample Form

Sample Form

9. DC POWER

Site Controller/Islander: +5 VDC N/A +12 VDC N/A -12 VDC N/A
PCU(s): +5 VDC 5.00 +12 VDC 11.98
ICR(s): +5 VDC 5.01 +12 VDC 11.99
Current Loop Interface: +5 VDC +12 VDC -12 VDC
Consoles: +5 VDC 5.00 +12 VDC 12.05 -12 VDC 12.00 +9 VDC 9.00
FPR(s): +5 VDC

10. SYSTEM APPROVALS

Customer Comments:

I am satisfied with the installation of the Gasboy Site Manager: Dave Christopher Date: 2-9-05
CFN System and have been trained in its use and Start-up Tech: Arthur Ized Repp Date: 2-9-05
operation.

11. CUSTOMER KNOWLEDGE

Time Spent on Training: 4 hours Names of People Trained: Dave Christopher, Christine Tabby
Were test cards locked out? Y/N Who were test cards left with? Dave Christopher
Was backup copy made of system and any configuration changes? Y/N

Remarks:

(Use additional sheets if necessary)





12. ATTACH PRINTOUTS

Generate and attach printout showing a few transactions with quantity, pump fuel assignments,
limitation codes, authorization codes, and pulse rates. Use the commands PR DA, PR TR, PR PU, PR
AU, PR LIM, PR DI, PR PRI, PR PRO,
and STATUS.

13. PARTS USED

Return defective parts with completed Gasboy Service Report. Please return white, yellow, and
pink copies of report in box with parts

This manual is related to the following products: