Starting a Site Controller III System

Start-up Overview

Page 4 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008

Start-up Overview

Start-up for the CFN SC III system consists of the following:

• Gathering site information from the customer for loading into the system
• Verifying the physical system layout
• Ensuring that the system complies with the guidelines and restrictions outlined in the

system Installation Manual and this manual

• Testing the system
• Helping the system user execute the commands needed to start the system
• Helping the system user back up release disks and explaining backup procedures
• Ensuring that the system user understands how to use the system
• Filling out the GASBOY CFN System Start-up Form (55F-066)

Required Tools

To perform testing at start-up, the following tools are required:

• Digital Voltmeter
• 1/4” Flat-blade Screwdriver
• Phillips

®

Head #1 Screwdriver

• Phillips Head #2 Screwdriver
• Plastic Flat-blade Screwdriver (1/8” or smaller)
• 1/4” Drive Socket Handle

Note: A socket bit (C04479) #2, for the Island Card Reader (ICR) is shipped with every

CFN SC III system. This socket should be left with the end user.

• Tape Measure
• Diskettes (two to four blank double-sided, high-density diskettes for the SC III. Two blank

high density diskettes for Profit Point).

Note: Gasboy recommends that all tools and spare parts are with you when performing a

start-up procedure.