beautypg.com

EXFO RTU 310-310G IP Services Test Head User Manual

Page 82

background image

Creating and Starting a Test Case

70

FTB-8500 Series and FTB-8120NGE/8130NGE

Introducing the Test Setup

The test path is created through the configuration of each layer that must
be crossed by the signal under test. The test path can contain the following
steps depending on the test application type:

For RTU-310:

For RTU-310G: