beautypg.com

EXFO RTU 310-310G IP Services Test Head User Manual

Page 129

background image

Creating and Starting a Test Case

Ethernet and Fibre Channel Application

117

Fibre Channel BERT Test Case

2. Port configuration:

2a. For RTU-310select the port

number by clicking on
Port 1 or Port 2.

For RTU-310Dual Ports,
select the first port and
proceed with the rest of
the configuration for the
first port. However, before
clicking Finish, click Back
several times to return to
the port setup window,
select the second port and
proceed with the rest of
the configuration for the second port.

Select the Fibre Channel speed.
Choices are 1X, and 2X.

2b. Select the PSP check box when a series

of handshakes (status machine) is
necessary to have a link up status. When the PSP check box is
cleared, no handshaking is done and only bit synchronization is
necessary to have a link up status. The PSP (Link Protocol)
check box is selected by default.

Link indicates the link status at the input port of the Fibre Channel
interface. A green LED indicates a link up while a grey LED indicates a
link down or disabled. The Tree view also displays respectively Link
up
in green or Link down in red.

2c. Click Next.