Backing up a processlogix server to tape – Rockwell Automation 1757-SWKIT3200 ProcessLogix R320.0 Installation and Upgrade Guide User Manual
Page 26

Publication 1757-IN032B-EN-P - April 2001
1-6 System Software Upgrade Procedures
What should you do if you do not meet the recommended
memory requirements:
If you do not meet the minimum free disk space requirement, you
can try one or more of the following actions to increase your free
disk space:
•
Compact the ERDB (Use the DbAdmin utility:
Start
⇒
Programs
⇒
ProcessLogix Engineering Tools
⇒
DBADMIN
⇒
Tools
⇒
Compact Database.)
•
Remove old error logs in directory C:\ErrorHandling,
•
Remove old backups you have of the ERDB.
•
Remove the Service Pack Uninstall directory C:\WINNT\
$NtServicePackUninstall$.
•
Move any of your application files not residing in the
C:\Honeywell tree to the other partition, if you have another
partition.
Backing Up a ProcessLogix Server to Tape
Use the following procedure to back up your current ProcessLogix
Server data to tape.
1. If the Server to be backed up is a member of a redundant Server
pair, synchronize the ER and Server databases.
a. Refer to Synchronizing ERDB on Redundant Servers on
b. Refer to Synchronizing Server Databases on Redundant
2. Insert a tape into the PC’s tape drive.
Wait for the tape to mount (stop making noise).
3. Click Start
⇒
Run.
ATTENTION
!
Before continuing, you MUST exit all ProcessLogix
applications and stop all ProcessLogix services.
Refer to Stopping ProcessLogix Applications and
Services on page 1-8.