Synchronizing server databases on redundant server, Confirming databases are synchronized, Confirming databases are synchronized -20 – Rockwell Automation 1757-SWKIT5100 ProcessLogix R510.0 Installation and Upgrade Guide User Manual
Page 180

Publication 1757-IN510A-EN-P - October 2003
6-20 Additional Redundant Server Procedures
7. Logon to SERVERB as ps_user.
Synchronizing Server
Databases on Redundant
Server
1 . On SERVERA, click Star t
⇒ Pr ograms ⇒ Pr ocessLogix
Ser ver
⇒Station.
2. Click View
⇒ System Status ⇒ Server Redundancy.
The Primary Server and Backup Server should be running and at
least one link is OK. If this is not the case, review the prior
redundancy configuration steps before continuing.
3. Click the Oper field in the lower right corner of the display.
4. Enter >mngr< in the Station Logon dialog box and click OK.
5. Click Synchr onize.
6. When the Synchronize Databases (Y/N) prompt appears, enter
>Y< in the entry field above the display and press
Depending on your configuration, this may take some time to
complete.
7. Once the Synchronization Complete prompt appears, verify that
the display shows simulated Green LED indications for the
following states:
8. Click Station
⇒ Exit.
9. Click Yes to exit Station.
Confirming Databases are Synchronized
1 . On SERVERA, click
Star t
⇒ Run.
2. Enter >cmd< and click OK to open the DOS window.
LED(s)
State(s)
Primary Server
Running
Backup Server
Synchronized
Running
Link Status
Link 0 (LNK00) - OK Active link
Link 1 (LNK01) - OK (Only applies if you are using a dual LAN)