Commissioning – Lenze ECSCAxxx User Manual
Page 105
Commissioning
Carrying out basic settings with GDC
l
105
EDBCSXA064 EN 3.2
Detailed
information
Brief description
Settings
10. Set the polarity of the digital
inputs and outputs.
Select Terminal I/O
W Digital inputs/outputs in the GDC
parameter menu:
l
C0114/x (polarity of dig. inputs X6/DI1 ... DI4)
l
C0118/1 (polarity of dig. output X6/DO1)
^ 129
11. Enter machine parameters.
Set machine parameters as for instance maximum speed
and ramp times in the parameter menu under Short
setup
W Motor setting .
^ 130
12. Switch on the mains.
l
Green LED is blinking and red LED is off:
– Controller is ready for operation.
l
Green LED is off and red LED is blinking:
– An error has occurred. Eliminate the error before you
continue commissioning.
The basic settings are completed now.
Proceed as follows:
ƒ
Enable controller (
^ 131).
ƒ
Save parameters in the controller with C0003 = 1.
ƒ
Save parameter set with GDC in the parameter set file.
ƒ
Optimise drive behaviour (
^ 141).