Demonstration, Operation manual, Running the program – ACU-RITE MILLPWR 3 Axes User Manual
Page 95

DEMONSTRATION
MILLPWR
®
Operation Manual
4-19
Running the Program
The first step in running a new program is to establish datum.
Remember to chose the center of the bolt circle as datum.
•
Using the
MOVE TABLE
softkey and the arrows, position the
tool over the workpiece where you want the center of the bolt
circle’s datum to be.
•
Place your workpiece into a vise.
•
From the DRO screen, press the
DATUM
softkey.
•
Press the
X = 0
,
Y = 0
and
Z =0
softkeys to establish
the current tool position as datum.
•
Press the
ARROW DOWN
softkey.
•
Return to your program by pressing the
PGM
key. Perform a
second dry run, this time allowing the table to move, to see if there is
enough material to run the program. Set zero.
•
Touch the tool to the top surface of your workpiece.
•
Set the Z retract position 1” above the workpiece.
•
Press the
USE
key.
If your cursor
is positioned
past the last
step, MILLPWR
will automati-
cally go to step
001 when you
press GO.
•
Now press the
GO
key and check that the Z-axis
is engaged.
•
Press the
GO
key again.
MILLPWR
will run each
step at dry run speed without stopping.
If the part falls entirely within the workpiece, you can
cut the part.
•
Place the tool you want to use first into the spindle.
•
After you’ve finished moving the table, press the
MOVE
TABLE
softkey again to de-select it.