beautypg.com

2 servo amplifier inspection, 2 servo amplifier inspection - 3, Servo amplifier inspection -3 – Yaskawa Sigma II Series Servo System User Manual

Page 391: Periodic part replacement operating conditions

background image

Sigma II User’s Manual

Chapter 9: Inspection, Maintenance, and Troubleshooting

9 - 3

9.1.2

Servo Amplifier Inspection

For inspection and maintenance of the servo amplifier, follow the inspection proce-
dures in the following table. Perform inspection and maintenance at least once every
year. Other routine inspections are not required.

Servo Amplifier Inspection

Part Replacement Schedule

The following parts are subject to mechanical wear or deterioration over time. To
avoid failure, replace these parts at the frequency indicated.
The parameters of any servo amplifiers overhauled by Yaskawa are reset to the
default (standard factory) settings before shipping. Be sure to confirm that the
parameters are set to the application’s requirements before starting operation.

Periodic Part Replacement

Operating Conditions:

Ambient Temperature:

Annual average of 30°C.

Load Factor:

80%, maximum.

Operation Rate:

20 hours/day, maximum.

Action or

Problem

Frequency

Procedure

Comments

Clean interior and

circuit boards

At least every year

Check for dust, dirt, and oil

on the surfaces.

Clean with compressed air.

Loose screws

At least every year

Check for loose terminal

block and connector

screws.

Tighten any loose screws.

Defective parts in

unit or on circuit

boards

At least every year

Check for discoloration,

damage or discontinuities

due to heating.

Contact Yaskawa.

Part

Standard Lifespan

Replacement Method

Cooling fan

4 to 5 years

Replace with new part.

Smoothing capacitor

7 to 8 years

Test. Replace with a new part, if necessary.

Relays

Test. Replace if necessary.

Fuse

10 years

Replace with new part.

Aluminum electrolytic

capacitor on circuit

board

5 years

Test. Replace with new circuit board, if nec-

essary.