beautypg.com

Datum shift (cycle 7), 5 coor dinat e t ransf or mation cy cles – HEIDENHAIN TNC 406 User Manual

Page 177

background image

156

8 Programming: Cycles

8.5 Coor

dinat

e

T

ransf

or

mation Cy

cles

DATUM SHIFT (Cycle 7)

Application

Machining operations can be repeated at various locations on the
workpiece with a datum shift.

Effect

When the DATUM shift cycle is defined, all coordinate data is based
on the new datum.
The datum shift is indicated in the status display with the index T by
the shifted axes.

Input

Enter the coordinates of the new datum (zero point) for up to 5 axes.
Absolute values are referenced to the zero point, which is determined
by the manual datum setting. Incremental values are referenced to the
datum which was last valid (this may be a datum which has already
been shifted).

If you are working with the datum table, enter the name of the datum
(with the # key) from the table and the name of the datum table from
which the TNC is to activate the datum shift. If you do not enter a
name, the TNC automatically uses the datum table 0.D. A selected
datum table remains active until you activate another table at a later
stage in the program.

The status display STATUS COORD. TRANSF. shows you the datum
table and the datum number that are currently active.

Cancellation

A datum shift is canceled by entering the datum shift coordinates 0, or
with the number #0.

If you combine coordinate transformations, note that the
datum shift must be programmed before other
transformations.

X

Y

Z

Y

X

Z

Y

X

Z

X

Y

Y

X

Z

IX

IY

This manual is related to the following products: