beautypg.com

3 preparing for commissioning, 4 connect 24 vdc supply voltage, 7commissioning – Pilz PMCtendo DD5.03/000/0/0/0/110-230VAC User Manual

Page 161: 2 commissioning the servo amplifier

background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

7-5

7.2

Commissioning the servo amplifier

7

Commissioning

Wire components

24 VDC supply voltage ("+" to X4/1 via S1 switch and "-" to X4/3)

Enable hardware: Connect 24 VDC to terminal X3/12 via S2 switch

Mains contactor K1
– Connect A1 terminal to X3/1 via S3 switch
– Connect A2 terminal to DGND on the supply voltage

"STO-ENABLE deactivated" mode: Link terminals X4/5 und X4/1

Voltage for relay contact for operational readiness BTB/RTO: Link ter-
minals X4/5 and X3/2

Wire the main contacts of the mains contactor: connect to mains volt-
age and the terminals at X0

Connect servo motor to X8 terminals

Connect resolver to X2 sockets

Connect motor holding brake to X9 terminals

No external brake resistor: link X8, 4 and 5

7.2.3

Preparing for commissioning

Preparing for commissioning

7-

][Inbetrieb_vorbereiten_protego_D

Prepare the servo amplifier for commissioning:

The mains voltage and supply voltage are switched off.

A personal computer with the commissioning software installed is
connected.

An enable device in accordance with EN 292-1 is connected.

The ENABLE input on the servo amplifier has a “0” signal. The servo
amplifier is not enabled.

7.2.4

Connect 24 VDC supply voltage

Connect 24 VDC supply voltage

7-

][Inbetrieb_Versorgung_protego_D

1. Switch on 24 V power supply

Connect 24 VDC to the servo amplifier's control element (X4).

2. Press S1 switch “24 V on”

Procedure once supply voltage is applied:

LED display: X.XX (firmware version)

Relay contact for operational readiness BTB: open

After approx. 5 seconds:
– LED display: YY. (current strength, flashing dot for CPU O.K.)
– Relay contact BTB: closed