Commissioning the servo amplifier, 1 gather the project data, 2 wire components – Pilz PMCtendo DD5.03/000/0/0/0/110-230VAC User Manual

Page 159: 7commissioning, 2 commissioning the servo amplifier

background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

7-3

7.2

Commissioning the servo amplifier

7

Commissioning

7.2

Commissioning the servo amplifier

7200

Commissioning the servo amplifier

7-

][Inbetrieb_Vorgehensweise_DD5

Initial commissioning is a quick test of the servo amplifier. Proceed as
follows:
1. Gather the project data
2. Wire components
3. Preparing for commissioning
4. Connect 24 VDC supply voltage
5. Establish communication PMCtendo DD5 <-> PC
6. Set parameters for the servo amplifier
7. Perform the first test run

7.2.1

Gather the project data

Gather the project data

7-

][Inbetrieb_Projektdaten

You will need the following information about the drive components:

Mains voltage (network configuration, voltage value)

Motor type (motor data, if the motor is not in the motor database, see
online help)

7.2.2

Wire components

Wire components

7-

][Inbetrieb_Einl_Sicher

It is essential to note the following safety guidelines:

][Verdr_nie_unter_Spg_2

][Inbetrieb_Komponenten_DD5

The following components and circuits are required as a minimum con-
figuration for commissioning:

Components

PMCtendo DD5

PMCtendo ACx.xx servo motor with resolver

Mains contactor K1

24 VDC power supply for control element

DANGER!
Risk of electrocution!
Never wire the electrical connections on the servo amplifier
while voltage is applied.
Switch off the mains voltages and 24 V supply!
Make sure that the control cabinet is made safe, e.g. through an
access lock or warning signs. Do not switch on the voltages until
the system is commissioned!