beautypg.com

Operator’s manual – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 90

background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

82 / SYSTEM CONFIGURATION

Figure 50
Liquid Flow Calibration Screen

When the START key is engaged, the machine will become
operational. All necessary precautions must be taken to ensure
user safety. Failure to practice all necessary caution may result in
serious injury or death.

Tanks must contain material. Be prepared to catch the material in
a container so it can be weighed at the end of the calibration.

This manual is related to the following products: