beautypg.com

Operator’s manual, Working set member (wsmb) module, 12 / installation – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 20

background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

12 / INSTALLATION

WORKING SET MEMBER (WSMB) MODULE

Figure 10
Working Set Member Module

IMPORTANT: For applications using multiple modules, it is

recommended that the WSMB’s are mounted on the
implement by increasing serial number order from left to
right. This step will minimize setup time at the Module
Configuration screen pressing the Auto Sort button will
group same module types together and in the order the
modules are mounted on the implement.
After Auto Sort is performed, modules will appear on the
Module Configuration screen in groups by serial number
order and module type.

1. Select an area on the implement to mount the member that allows for

easy hookup and access. Extensions may be used to reach members
installed on remote areas of the implement.

2. The module can be mounted in the same orientations as the Working

Set Master (WSMT) as illustrated in (

Figure 9

).

Do not install the module in any orientation other than illustrated
in (

Figure 9

). The connection wires must not be mounted upward

as moisture can collect inside the unit and damage the circuits.
Ensure that module connectors do not face upward when
implement is in a folded position as well.

3. Mount with the label side of the module facing out.
4. To bolt the member to a frame:

• Use the enclosure as a template to mark the location of the mounting

holes.

• Drill two 9/32 inch diameter holes where marked.
• Attach to frame using 1/4 x 20 bolts or other fastening devices as

illustrated in (

Figure 11

).

4.00

.291

2 HOLES

4.63

4.68

1.37

0.630

2.36

5.24

This manual is related to the following products: