Operator’s manual, 5 rev test – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual
Page 73
OPERATOR’S MANUAL
IntelliAg PDC User 2 & 3
11001-1501-200811
SYSTEM CONFIGURATION / 65
5 REV TEST
5 Rev Test checks the seed meters for accuracy. When started, the test will
run the control for five revolutions of the seed meters then shut down. The
seed count can then be correlated on a row versus the seed count actually
dispensed by the meter. A remote test switch is recommended to perform
this test.
To perform 5 Rev Test:
1. Press the Control Setup button.
2. Press the Channel Setup button.
3. Select the 5 Rev Test button to access the 5 Rev Test screen.
4. The following parameters must be entered to perform a 5 Rev Test.
– Test Ground Speed
– Row
The values entered do not affect any other setup values that have
previously been tested.
Figure 42
5 Rev Test Screen
TEST GROUND SPEED
Test Ground Speed is the ground speed reference used to perform the test.
ROW
Row is the active row configured in the system. The row that is set here is
the row that reports back a seed count in the Test Seed Count value. The
operator can change the row # to get the seed count of all rows during the
test.
TEST TARGET POP
Test Target Pop is the seed rate at which the test is performed. This value
is the current target rate and is automatically populated.