beautypg.com

Operator’s manual, Continuous test – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 71

background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

SYSTEM CONFIGURATION / 63

CONTINUOUS TEST

Continuous Test runs the control while stationary for troubleshooting or
maintenance purposes. A remote test switch is recommended to perform
this test.

1. To access the Continuous Test screen, press the Control Setup

button.

2. Press the Channel Setup button.
3. Press the Continuous Test button to display the Continuous Test

screen.

4. The following parameters must be entered to perform a Continuous

Test:
– Test Ground Speed
– Row

The values entered will not affect any other setup values that have
previously been entered.

Figure 41
Continuous Test Screen

TEST GROUND SPEED

Test Ground Speed is the ground speed reference used to perform the test.

ROW

Row is the active row viewed on the system. The row that is set here is the
row that reports back a seed count in the Test Seed Count value. The
operator can change the row # to get performance of all rows during the
Continuous Test to see row-to-row variability.

TEST TARGET POP

Test Target Pop is the seed rate at which the test is performed. This value
is the current target rate and is automatically populated.

This manual is related to the following products: