beautypg.com

Operator’s manual – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 27

background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

INSTALLATION / 19

NOTE: The ignition lead must be

connected to switched +12VDC
for the system to power up and
down properly.

10” VIRTUAL TERMINAL CAB HARNESS CONNECTIONS

Connect the power leads directly to the battery.

1. Connect the ignition wire to a switched +12VDC.
2. Connect the Chassis Ground lead to a bare point of the cab frame that

offers a good chassis ground connection.

3. Connect the Master Switch, CAN Terminator, Radar Speed Sensor,

GPS, and Tractor ECU to their respective connectors on the cab
harness. If the Speed Sensor is to be connected to the WSMT, do not
connect anything to the Speed Sensor connector on the Cab Harness.

This manual is related to the following products: