beautypg.com

Operator’s manual, Material application rates – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual

Page 164

background image

OPERATOR’S MANUAL

IntelliAg PDC User 2 & 3

11001-1501-200811

156 / TASK CONTROLLER

Figure 96
Implement Offset and Channel Linking screen

CHANNEL LINKING

Channel Linking allows control channels to be linked together so that rates
can be increased or decreased simultaneously and turned on or off at the
Main Work screen.

To Link Channels:

1. At the Control Channel table, press the Channel input box and select

the linking symbol for the channels to be linked together.

(

Figure 96

) depicts channels 1 and 3 linked together to control rates and

turn the Channels on and off simultaneously.

MATERIAL APPLICATION RATES

The Material Rate button resets a system to IntelliAg rates that has been
running a task under Task Controller map control. An SD Card graphic icon
on the IntelliAg Work screen indicates this condition. The Material Rate
button appears on the IntelliAg Work screen to select current rates or to
reload IntelliAg rates.

The Material Rate button only appears if a task is stopped in Task
Controller and:

– ground speed is greater than 0
– the implement lift switch is down (operate mode)
– the master switch in ON for 5 seconds

Top view of
implement/channel
position

Coordinates required
for Task Controller

Coordinates required
for Area Accumulators

Channel Linking

This manual is related to the following products: