Operator’s manual – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual
Page 22
OPERATOR’S MANUAL
IntelliAg PDC User 2 & 3
11001-1501-200811
14 / INSTALLATION
5. To tie-strap the member to a frame:
• Use one long tie-strap to loop around the member body and through
both mounting holes as illustrated in (
Figure 12
).
• If necessary, drill mounting holes following the procedure described
above.
• Securely tighten tie-strap.
• Install a second tie-strap toward the label end of the enclosure for
additional support.
Figure 12
Working Set Member Installation (Tie-Strap)
6. Connect a WSMB harness to the WSMB module and connect the
WSMB harness to the Power/CAN backbone, refer to (
Figure 16
).
7. Connect each module harness to its module, inserting both connectors
until the connector locking tabs engage.
8. Lay out the planter harness along the frame of the implement to each
of the seed sensors. For seed sensors, extensions will most likely not
be necessary.
9. Route sensor wires in locations where they will not be damaged by
chains, drive shafts, sprockets, etc.
10. Secure the harness to the toolbar with a minimum of 3” straight wire
exiting the module before bending and attaching with tie-straps ensure
good wire sealing.
11. Coil and secure any unused sensor connections.
12. The WSMB Module harness can accept a standard DICKEY-john PM
style planter harness (single round 37-pin connector) or an SE style
planter harness (1 gray 12-pin, 1 black 12-pin rectangular connector)
depending on the WSMB harness used. Harnesses are available for a
number of row configurations.
• Route the planter harness on the implement, securing as necessary.
• Install seed sensors per the instructions included with the sensors.
Refer to the implement harness diagram for additional information
(
Figure 13
) or (
Figure 14
).
IMPLEMENT
FRAME