Operator’s manual, 20 / installation, Optional – Great Plains DICKEY-john IntelliAg Planter-Drill Control L3 User Manual
Page 28: Figure 15 implement harness
OPERATOR’S MANUAL
IntelliAg PDC User 2 & 3
11001-1501-200811
20 / INSTALLATION
Figure 15
Implement Harness
WSMT
MODULE
PLANTER/DRILL
CONTROL
.
Connect to next module
harness or implement
extension harness
(See Figure 15)
(Connect CAN terminator
if this is the last module
on the CAN bus)
WSMT Actuator Harness
46798016X
WSMT Module Harness
46798085X
Implement CAN Breakaway Harness
46798013X (multiple lengths)
Connect to
Cab Harness
Connect harnesses and accessory devices as
shown. Verify that PWM Solenoid Valves have a
properly connected feedback sensor.
Standard Dj SE Style
Planter Harness
NOTE: Connect the WSMT Actuator Harness
and the Dj Planter Harness to the mating
connectors of the WSMT Module Harness
Application Rate
Sensors x 4
(Channel 1-4 Feedback)
Labeled FB1-FB4
PWM Solenoid
Valves
Channel 1-4
Control
Labeled PWM 1-PWM 4
Hopper Level Sensor
Labeled HOPPER 1
Radar Speed Sensor
Labeled GND Speed
Fan/Shaft RPM Sensor
Labeled RPM1 or
Implement Lift Sensor
Labeled IMP LIFT
If no Implement Lift
Sensor is used, connect
the IMP LIFT leads
together
Remote
Test Swtich
Servo Valve
Connectors
Accessory Sensor
Connection
Air Pressure
Sensor 46682-0920S1
464820510
Switch 1 (Output 1)
Switch 2 (Output 2)
Switch 5
Switch 6
464820510
Switch 3
Switch 4
Planter
Output
Module
464820510
467983500
46798200051
OPTIONAL
46798081S1