Great Plains Full Press Drill Post Conversion User Manual
General information, Caution, Post conversion update
© Copyright 2002 Printed
Great Plains Mfg., Inc.
Used with:
Installation Instructions
104-010M
Full Press Drill
Post Conversion Update
• 30’ 3-Section Full Press Drill
• 30’ High Clearance Full Press Drill
General Information
When you see this symbol, the subsequent instructions and
warnings are serious - follow without exception. Your life and
the lives of others depend on it!
!!
These instructions explain how to install the Full
Press Post Conversion Kit.
These instructions apply to:
104-008A
RH Full Press Post and Conv. Kit
104-009A
LH Full Press Post and Conv. Kit
104-011K
RH Full Press Conv. Kit
104-012K
LH Full Press Conv. Kit
Manual Update
Refer to the Full Press Drill operator’s manual for
detailed information on safely operating, adjust-
ing, troubleshooting and maintaining the Full
Press Post Conversion. Refer to the parts manual
for part identification.
105-100M
Operator’s/Parts Manual
129-035M
Operator’s Manual
129-035P
Parts Manual
Before You Start
Pages 6 and 7 are a detailed listing of parts in-
cluded in the Full Press Post Conversion
package. Use this list to inventory parts received.
Tools Required
• Basic hand tools
• Acetylene torch
• Welder
• Grinder
Definitions
Right-hand and left-hand as used in this manual
are determined by facing the direction the ma-
chine will travel while in use unless otherwise
stated.
9/9/2002
!
CAUTION!
Use caution when using tools which emit sparks such
as torches, welders and grinders. Do not use spark
emitting tools in areas where flammable or explosive
materials may be present. Do not allow anyone to en-
ter into the path of sparks.
Note: These instructions are written with the as-
sumption that the existing pivot post is in usable
condition and does not need replaced. This re-
quires kits 104-011K and 104-012K.
If the existing pivot post needs replaced order kits
104-008A and 104-009A and skip steps 14
through 22.