Installation of detector (sx3-a0, sx3-b0), Outline of detector installation procedure, How to treat the mounting surface – Dwyer UXF2 User Manual
Page 28: How to mount the frame
- 18 -
3.5. Installation of detector (SX3-A0, SX3-B0)
3.5.1. Outline of detector installation procedure
(1) Treat the surface to mount on the detector.
(2) Mount the frame.
(3) Mount the sensor unit.
3.5.2. How to treat the mounting surface
By thinner, sandpaper, etc., eliminate rust, pitch, convex and concave from the pipe surface to mount on the detector by the
frame length to occupy.
Note: 1. If jute is wound on the pipe, peel off the jute over the entire periphery by frame length (L) + 200 mm
beforehand.
Jute winding
Pipe
L+200mm
Fig. 3-1 L: Frame length (SX3-A0: 228 mm, SX3-B0 348 mm)
3.5.3. How to mount the frame
z
Mount the frame carefully not to cut your fingers with stainless steel belt.
(1) Pass the spring fixture on the stainless steel belt as
shown in Fig. 3-2.
Spring fixture
Stainless steel belt
Fig. 3-2
(2) Pass the stainless steel belt through 2 belt holes on
the frame as shown in Fig. 3-3.
Frame
Fig. 3-3
BULLETIN F-70