The maximum response time after a control signal is turned ON to operate the ROBO Cylinder in a PLC
sequence program, until a corresponding response (status) signal is returned to the PLC, is expressed by the
formula below:

Maximum response time (msec) = Yt + Xt + 3 + command processing time (operation time, etc.)

Yt: Master

station

o node transmission delay

Xt: Node

o master station transmission delay


For the master station

o node transmission delay (Yt) and node o master station transmission delay (Xt),

refer to the operation manuals for the DeviceNet master unit and PLC installed in the master unit.




















Field network transmission delay

PLC sequence program

Control signal

Status signal

Master station

o node

transmission delay (Yt)

Node

o master station

transmission delay (Xt)

Command processing time

PCON

Control signal

Status signal