Handling inverters – Yaskawa G5HHP Drive User Manual
Page 27

2 - 1
2
Handling Inverters
This chapter describes the checks required upon receiving a VS-616G5 In-
verter and describes installation methods.
2.1 Confirmations upon Delivery
2 - 2
. . . . . . . . . . . . . .
2.1.1 Nameplate Information
2 - 2
. . . . . . . . . . . . . . . . . . . . . . . . .
2.2 Temporary Storage
2 - 3
. . . . . . . . . . . . . . . . . . . . . .
2.2.1 Storage Location
2 - 3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.2 Storage Method
2 - 3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3 Transportation
2 - 4
. . . . . . . . . . . . . . . . . . . . . . . . . .
2.3.1 Precautions During Transportation
2 - 4
. . . . . . . . . . . . . . . .
2.3.2 Lifting with Wires
2 - 4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3.3 Transporting on Rollers
2 - 5
. . . . . . . . . . . . . . . . . . . . . . . . .
2.4 External Dimensions and Mounting
Dimensions
2 - 6
. . . . . . . . . . . . . . . . . . . . . . . . . . .
2.5 Checking and Controlling the Installation
Site
2 - 10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.5.1 Installation Site
2 - 10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.5.2 Controlling the Ambient Temperature
2 - 10
. . . . . . . . . . . . . .
2.5.3 Protecting the Inverter Panel from Foreign Matter
2 - 10
. . . .
2.5.4 Floor Level
2 - 10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.5.5 Inverter Panel Connections
(Side-by-side Connection)
2 - 10
. . . . . . . . . . . . . . . . . . . .
2.5.6 Tightening Anchor Bolts
2 - 11
. . . . . . . . . . . . . . . . . . . . . . . .
2.6 Installation Orientation and Space
2 - 13
. . . . . . . . . .
2.7 Removing/Attaching the Digital Operator
2 - 14
. . . .