Programming, Figure 165 restoring configuration (continued) – Outback Power Systems MATE3 Owners Manual User Manual
Page 138
Programming
136
900-0117-01-00 Rev C
Figure 165 Restoring Configuration (continued)
Set Points:
Wizard Grid Use Schedule (see page 126):
Period 1 Enable - N or Y
Weekday Use - 0:00 Drop 0:00
Weekend Use - 0:00 Drop 0:00
Period 2 Enable - N or Y
Weekday Use - 0:00 Drop 0:00
Weekend Use - 0:00 Drop 0:00
Period 3 Enable - N or Y
Weekday Use - 0:00 Drop 0:00
Weekend Use - 0:00 Drop 0:00
Wizard High Battery Transfer (See pages 122 and 125):
Mode – Y or N
Grid Connect - xx.x VDC Delay xx min
Grid Disconnect - xx.x VDC Delay xx min
Grid Connect SOC xx% Disconnect SOC xx%
Wizard Battery Monitor (See page 112):
(These screens will only be available if a FLEXnet DC Battery
Monitor is installed in the system.)
Shunt A:
Connection - Disabled, Inverter, Charge Controller,
DC Load, DC Gen, Wind Turbine, Hydro
Shunt B:
Connection - Disabled, Inverter, Charge Controller,
DC Load, DC Gen, Wind Turbine, Hydro
Shunt C:
Connection - Disabled, Inverter, Charge Controller,
DC Load, DC Gen, Wind Turbine, Hydro
...continued from previous page.
Soft Keys:
Pressing
Setup Complete screen. See Figure 166 to apply the changes to the system.