beautypg.com

Prerequisites for allocating volumes, Allocating volumes from general tasks, 140 allocating volumes from general tasks – HP XP Array Manager Software User Manual

Page 140

background image

Related topics

About allocating volumes

, page 138

Allocating volumes from general tasks

, page 140

Allocating volumes to selected hosts

, page 141

Allocating selected volumes to hosts

, page 142

Allocating volumes to clustered hosts

, page 143

Allocating volumes by using a keyword search

, page 144

Allocating volumes by using a criteria search

, page 145

Allocating volumes by using existing volume settings

, page 146

Allocate Volumes dialog box

, page 146

Prerequisites for allocating volumes

Before allocating volumes to a host you must verify that the host, and storage systems are registered
in HP XP7 Command View Advanced Edition.

If you want to select volumes from a tier, Tiered Storage Manager license must be enabled.

In addition, determine:

The target host

The volume type, count, capacity, and performance characteristics

An appropriate storage system

Related topics

About allocating volumes

, page 138

Allocating volumes from general tasks

The General Tasks list is conveniently located for volume allocation (and other frequent tasks). Because
you have not selected a specific resource (for example, a volume or a host) the dialog will prompt
for all necessary information.

To allocate volumes from General Tasks:

1.

From the Resources or Mobility tab, select Allocate Volumes.

TIP:

If you do not see Allocate Volumes listed, click more... to see all menu items.

The Allocate Volumes dialog box will launch.

2.

Specify your volume allocation requirements.

3.

Click Show Plan and confirm that the information in the plan summary is correct. If changes are
required, click Back.

4.

(Optional) Update the task name and provide a description.

Provisioning storage

140