2. W

ork Flow before Operation Start

11

2.2 Items to Prepare Beforehand

The Vision System explained in this manual is in regard to the equipment’s operation and its
program. The equipment and components that construct the system need to be prepared
separately.

1) Vision System

Corresponding Product

(Note) Please ask each vision system supplier to have the settings on Vision System such as the work

detection setting and the output communication format indicated by our products [refer to Section
8.1].

x

PIO Cable

(There are some cases that the dedicated accessary is required. Please refer to the
Instruction Manual for each Vision System.
e.g. FZ-VP, Parallel I/O cable dedicated for OMRON FZ3)

x

For Ethernet Connection

LAN cable (Category 5 or higher)
Hub

x

For RS232C Connection

Apply a cable that has a connector suitable for the camera controller on one end and D-sub
9-pin connector (female) on the other end (XSEL end).
[Refer to the Instruction Manual for each Vision System for the wiring on the camera controller
side.]
[Refer to the Appendix at the end for the wiring on XSEL side.]

x

If Using Work Detection Sensor

Photoelectric sensor

Examples of Vision System Models

Supplier

Model

Interface

Cognex

In-Sight EZ-110 (EZ-110XL)

In-Sight 5000 Series

Ethernet

OMRON

F210-C10

FZ3

RS232C

Keyence

CV2000

CV3000

CV5000

XG-7000

Ethernet
RS232C