2 items to prepare beforehand – IAI America XSEL-S User Manual
Page 17
2. W
ork Flow before Operation Start
11
2.2 Items to Prepare Beforehand
The Vision System explained in this manual is in regard to the equipment’s operation and its
program. The equipment and components that construct the system need to be prepared
separately.
1) Vision System
Corresponding Product
(Note) Please ask each vision system supplier to have the settings on Vision System such as the work
detection setting and the output communication format indicated by our products [refer to Section
8.1].
x
PIO Cable
(There are some cases that the dedicated accessary is required. Please refer to the
Instruction Manual for each Vision System.
e.g. FZ-VP, Parallel I/O cable dedicated for OMRON FZ3)
x
For Ethernet Connection
LAN cable (Category 5 or higher)
Hub
x
For RS232C Connection
Apply a cable that has a connector suitable for the camera controller on one end and D-sub
9-pin connector (female) on the other end (XSEL end).
[Refer to the Instruction Manual for each Vision System for the wiring on the camera controller
side.]
[Refer to the Appendix at the end for the wiring on XSEL side.]
x
If Using Work Detection Sensor
Photoelectric sensor
Examples of Vision System Models
Supplier
Model
Interface
Cognex
In-Sight EZ-110 (EZ-110XL)
In-Sight 5000 Series
Ethernet
OMRON
F210-C10
FZ3
RS232C
Keyence
CV2000
CV3000
CV5000
XG-7000
Ethernet
RS232C