IAI America XSEL-KET User Manual
Page 281

262
Part 4 Commands
INTELLIGENT ACTUATOR
Step E
N
Cnd
Cmnd
Operand 1 Operand 2
Pst
Comment
31
TAG
1
Beginning of loop processing
32
PACH
1
9
Palletizing arch motion
33
Z point specified by Position No. 9
34 ARCH
8
9
Arch
motion
35
Z point specified by Position No. 9
36 PINC
1
600
Increment palletizing position
number by 1.
37 600 GOTO
1
Go to beginning of loop if PINC is
successful.
38
39
EXIT
End of task
40
No.
Axis 1
Axis 2
Axis 3
Axis 4
Remarks
1
100.000
100.000
100.000
*.***
Reference point data
2
*.*** *.*** *.*** *.***
(Not
used)
3
*.*** *.*** *.*** *.***
(Not
used)
4
*.***
*.***
50.000
*.***
Arch-trigger point data
5
*.*** *.*** *.*** *.***
(Not
used)
6
*.*** *.*** *.*** *.***
(Not
used)
7
*.*** *.*** *.*** *.***
(Not
used)
8
0.000
0.000
100.000
0.000
Picking-position point data
9
*.***
*.***
0.000
*.***
Z point data
10