HEIDENHAIN TNC 410 ISO Programming User Manual
Page 302

276
8 Programming: Cycles
8.7 SL Cy
cles Gr
ou
p II (no
t T
N
C
4
1
0)
U
U
U
U
Milling depth
Q1 (incremental value): Distance
between workpiece surface and contour floor.
U
U
U
U
Finishing allowance for side
Q3 (incremental
value): Finishing allowance in the working plane.
U
U
U
U
Workpiece surface coordinate
Q5 (absolute value):
Absolute coordinate of the workpiece surface
referenced to the workpiece datum.
U
U
U
U
Clearance height
Q7 (absolute value): Absolute
height at which the tool cannot collide with the
workpiece. Position for tool retraction at the end of
the cycle.
U
U
U
U
Plunging depth
Q10 (incremental value): Dimension
by which the tool plunges in each infeed.
U
U
U
U
Feed rate for plunging
Q11: Traversing speed of the
tool in the tool axis.
U
U
U
U
Feed rate for milling
Q12: Traversing speed of the
tool in the working plane.
U
U
U
U
Climb or up-cut ? Up-cut = –1
Q15:
Climb milling: Input value = +1
Up-cut milling: Input value = –1
To enable climb milling and up-cut milling alternately
in several infeeds:Input value = 0
Example: NC block
N62 G125 Q1=-20 Q3=+0 Q5=+0 Q7=+50 Q10=+5
Q11=100 Q12=350 Q15=+1 *