7 completing the installation, Completing the installation – Artesyn MVME2502 Installation and Use (April 2015) User Manual
Page 52

Hardware Preparation and Installation
MVME2502 Installation and Use (6806800R96E)
52
Removal Procedure
1. Turn off the power.
2. Disconnect all the cables.
3. Press the red locking tabs (IEEE handles only) to eject the board.
4. Loosen and remove the screws adjacent to the injector/ejector levers that securing the
module to the chassis.
5. Move the injector/ejector levers in outward direction.
6. Hold top and bottom edges of the board and exert minimal force when pulling the board
from the chassis to prevent pin damage.
7. Carefully remove the board from the chassis and store the board in anti-static envelope.
2.7
Completing the Installation
The board is designed to operate as an application-specific computer blade or an intelligent I/O
board/carrier. It can be used in any slot in a VME chassis. Once the board is installed, you are
ready to connect peripherals and apply power to the board.
Product Damage
RJ-45 connectors on modules are either twisted-pair Ethernet (TPE) or E1/T1/J1
network interfaces. Connecting an E1/T1/J1 line to an Ethernet connector may damage
your system.
Make sure that TPE connectors near your working area are clearly marked as network
connectors.
Verify that the length of an electric cable connected to a TPE bushing does not exceed
100 meters.
Make sure the TPE bushing of the system is connected only to safety extra low voltage
circuits (SELV circuits).
If in doubt, ask your system administrator.
- MVME2502 Installation and Use (August 2014) MVME2500 Installation and Use Manual (February 2014) MVME2500 ECC Installation and Use (August 2014) MVME2500 Installation and Use (April 2015) MVME2500 Installation and Use Manual (March 2015) MVME2502 Installation and Use (April 2014) MVME2502 Installation and Use (December 2014)