2 unpacking and inspecting the board, Unpacking and inspecting the board – Artesyn MVME2502 Installation and Use (April 2015) User Manual
Page 40

Hardware Preparation and Installation
MVME2502 Installation and Use (6806800R96E)
40
2.2
Unpacking and Inspecting the Board
Read all notices and cautions prior to unpacking the product.
Shipment Inspection
To inspect the shipment, perform the following steps:
1.
Verify that you have received all items of your shipment:
MVME2502 board
Quick Start Guide
Safety Notes Summary
Any optional items ordered
2. Check for damage and report any damage or differences to customer service.
3.
Remove the desiccant bag shipped together with the board and dispose of it according to
your country’s legislation.
Damage of Circuits
Electrostatic discharge and incorrect installation and removal can damage circuits or
shorten its life.
Before touching the board or electronic components, make sure that you are working
in an ESD-safe environment.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.
- MVME2502 Installation and Use (August 2014) MVME2500 Installation and Use Manual (February 2014) MVME2500 ECC Installation and Use (August 2014) MVME2500 Installation and Use (April 2015) MVME2500 Installation and Use Manual (March 2015) MVME2502 Installation and Use (April 2014) MVME2502 Installation and Use (December 2014)