2 power up sequencing requirements, Functional description – Artesyn MVME2502 Installation and Use (April 2015) User Manual
Page 103

Functional Description
MVME2502 Installation and Use (6806800R96E)
103
4.15.2 Power Up Sequencing Requirements
The power up sequence describes the voltage rail power up timing, which is designed to
support all the chip supply voltage sequencing requirement.
+1.5 V
1.425 V
1.575 V
+1.2 V
1.14 V
1.26 V
+1.2 V_SW
1.14 V
1.26 V
+1.05 V
1.0 V
1.1 V
Table 4-5 Voltage Supply Requirement (continued)
Voltage Rail
Voltage Rail Requirement
Minimum
Maximum
This manual is related to the following products:
- MVME2502 Installation and Use (August 2014) MVME2500 Installation and Use Manual (February 2014) MVME2500 ECC Installation and Use (August 2014) MVME2500 Installation and Use (April 2015) MVME2500 Installation and Use Manual (March 2015) MVME2502 Installation and Use (April 2014) MVME2502 Installation and Use (December 2014)