beautypg.com

Lenze PC-based Automation Industrial PC User Manual

Page 117

background image

2.5 EN - 01/2012

L

117

Industrial PC | Parameter setting & configuration

Visualisation with »VisiWinNET®«

Constellation and connection

How to transfer an application to the target device:

1. Select ProjectTransmit to target device in the »VisiWinNET®«

menu bar.
• The Connect device window appears.

2. Enter the IP address of the IPC in the IP address or network name text field.

You can view and alter the IP address of the IPC in the "Network Connections"

program.

Configuring the Industrial PC

( 30)

3. Click the Connect button.

Note!
If the firewall of Windows® XP is active, you have to enable a port for

»VisiWinNET®«. In the standard setting this is port 10116.
• The application is transferred to the target device.