beautypg.com

IAI America PCON-CFA User Manual

Page 237

background image

4. SCON-CA

229

(6) Home return

(HOME) PLC output signal

Home return completion

(HEND) PLC input signal

Under Home return Operation (GHMS) PLC input signal
When the “HOME” signal is turned “ON”, this command is processed at the startup (ON edge), and the

home return operation is performed automatically. During the home return operation, the “GHMS” signal is

turned “ON”.

When the “HEND” signal is turned “ON”, turn “OFF” the “HOME” signal.

Once the “HEND” signal is turned “ON”, it can not be turned “OFF” until the power is turned “OFF” or the

“HOME” signal is input again. Once the HEND signal is turned ON, it can not be turned OFF until the power

is turned OFF or the HOME signal is input again.

Even after the completion of the home return operation, when the “HOME” signal is turned “ON”, the home

return operation can be performed.

Caution: In the Remote I/O Modes 1 to 3 and Position/Simplified Direct Value Modes 1 and 2, when the

positioning command is issued without performing the home return operation after the power

injection, the positioning is performed after the automatic home return operation.

Exercise caution that in the Half Direct Modes 1 to 3 or Full Direct Mode, issuing a positioning

command to a given position following the power on, without performing a home return first, will

generate an alarm “Error Code 83: ALARM HOME ABS (absolute position move command

when home return is not yet completed)” (operation-reset alarm).

Actuator operation

Mechanical endStopped at the home position

This manual is related to the following products: