beautypg.com

Nortel Networks NN43001-301 User Manual

Page 178

background image

178

Clock Controller description and installation

16

Insert the replacement card into the selected slot and hook the
locking devices.

17

Connect the reference cables (J1 and J2) and the clock-to-clock
cable (J3) to the replacement card.

18

Set the ENB/DIS switch to ENB on the replacement card.

19

Disable the software and enable the card. At the prompt, enter:

LD 60

DID CC x

Disable clock controller card, where x=0 or 1

ENL CC x

Enable clock controller card, where x=0 or 1

20

Verify that the card is active. At the prompt, enter:

SSCK x

Get status of system clock, where x=0 or 1

****

Exit the overlay

Note: Wait two minutes before proceeding to next step.

21

Activate the new card and verify that it is active. At the prompt enter:

LD60

SWCK

Switch system clock from active to standby

SSCK x

Get status of system clock, where x = 0 or 1

TRCK PCK

Track primary clock, where x = 0 or 1

RCNT

Reset alarm counters of all digital cards

****

Exit the overlay

22

Set the clock source to the status it was in before the replacement
procedure.

23

Verify clock switchover and tracking. At the prompt, enter:

SWCK

Switch system clock from active to standby

SSCK x

Get status of system clock, where x = 0 or 1

****

Exit the overlay

—End—

Nortel Communication Server 1000

ISDN Primary Rate Interface Installation and Commissioning

NN43001-301

02.03

Standard

Release 5.5

7 December 2007

Copyright © 2003-2007, Nortel Networks

.