176

Clock Controller description and installation

4

Set the ENL/DIS switch to DIS on the card you are removing.

5

Tag and disconnect the cables to the card you are removing.

6

Unhook the locking devices on the card and pull it out of the card
cage.

—End—

Follow these procedures to install new equipment with Clock Controller on
Large Systems.

Procedure 21

Installing new equipment

Step

Action

1

Set the ENB/DIS switch to DIS on the replacement card.

2

Set the option switches on the replacement card (NTRB53). Refer to

Table 67 "Clock Controller switch settings for NTRB53" (page 170)

.

3

Insert the replacement card into the vacated slot and hook the
locking devices.

4

Connect the reference cables (J1 and J2) to the replacement card.

CAUTION

Clock-to-Clock cable J3 should never be connected
between the old clock (QPC471 or QPC775) and the new
clock (NTRB53).

5

Set the ENB/DIS switch to ENB on the replacement card.

6

Software enable the card. At the prompt, enter

LD 60

ENL CC x

Enable clock controller card, where x = 0 or 1

7

Verify that the card is active. At the prompt, enter:

SSCK x

Get status of system clock where x = 0 or 1

****

Exit the overlay

8

Switch to the core with the new clock. At the prompt, enter: