9424200994 Rev N

399

Step 5: Repeat step 4 for the 5,000 ms and 10,000 ms time delay settings of Table 144. Record the

results.

Step 6: (Optional.) Repeat steps 1 through 5 for settings group 1, 2, and 3.

Step 7: (Optional.) Repeat steps 1 through 6 for 27X-2, 27X-3, and 27X-4.

Pickup Verification (V2 Mode)

Step 1: Use BESTCOMSPlus to send the operational settings in Table 145 to the BE1-11g. Reset all

targets.

Table 145. Operational Settings (V2 Mode)

Setting

Value

BESTCOMSPlus Screen

Description

Phase VT Ratio

1

System Parameters, Sensing
Transformers

Sets phase VT ratio to 1

Phase VT
Connection

4W-Y

System Parameters, Sensing
Transformers

Sets phase VT connection to
4W-Y

27/59 Mode

PN

System Parameters, Sensing
Transformers

Sets 27/59 mode to phase-
neutral

Element Mode

V2

Protection, Voltage, Undervoltage
(27X-1)

Enables 27X-1 function for V2
mode

Inhibit Level

10 V

Protection, Voltage, Undervoltage
(27X-1)

Sets inhibit level to 10 V

Timing Mode

Definite

Protection, Voltage, Undervoltage
(27X-1)

Selects definite timings

27X-1 V2

Enabled Target Configuration, Targets

Enables V2 target for 27X-1

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus programmable logic shown in Figure 282.

Blocking is disabled.

OUT1 closes for 27X-1 Trip.

OUT2 closes for 27X-1 Pickup.

Fault recording is enabled.

Figure 282. BESTlogicPlus Settings (V2 Mode)

Step 3: Use BESTCOMSPlus to open the Protection, Voltage, Undervoltage (27X-1) screen and send

the first row of test settings in Table 146 to the BE1-11g.

Table 146. Pickup Test Settings (V2 Mode)

Pickup Setting

Time Delay

78 V

50 ms

38 V

50 ms

22 V

50 ms

BE1-11g

Auxiliary Undervoltage (27X) Test