beautypg.com

Basler Electric BE1-11g User Manual

Page 398

background image

386

9424200994 Rev N

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus Programmable Logic shown in

Figure 277.

Blocking is disabled.

OUT1 closes for 25.

OUT2 closes for 25 Voltage Monitor.

Figure 277. BESTlogicPlus Settings (25)

Step 3: Use BESTCOMSPlus to open the Protection/Voltage/Sync-Check (25) screen and send the test

settings in Table 133 to the BE1-11g.

Table 133. Time Pickup Test Settings (25VM)

Setting

Value

Description

25 Voltage Monitor Live
Voltage

90%

Sets live voltage to 90 V (90% of nominal, nominal
= 100 V)

25 Voltage Monitor
Dead Voltage

55%

Sets dead voltage to 55 V (55% of nominal, nominal
= 100 V)

25 Voltage Monitoring
Drop Out Delay

0

Sets drop out delay to 0

25 Voltage Monitor
Logic

Check boxes as
shown in Figure 278.

Enable: Dead Phase/Dead Aux, Dead Phase/Live
Aux, Live Phase/Dead Aux

Figure 278. BESTCOMSPlus Sync-Check Screen, 25 Voltage Monitor Logic

Step 4: Prepare to monitor the 25VM function operation. Operation can be verified by monitoring OUT2.

Step 5: Connect BE1-11g terminals C13 (A-phase), C14 (B-phase), and C15 (C-phase) together. Apply

a single phase, 0 Vac, 50 or 60-hertz ac voltage source (Line VTP) to the three jumpered
terminals and the neutral terminal (C16). OUT2 should be closed.

Step 6: Slowly increase the line voltage until OUT2 opens (55 volts). Record the result.

Step 7: Increase the voltage until OUT2 closes (90 volts). Record the result.

Step 8: Remove voltage source 1. Connect a second single-phase 50 or 60-hertz voltage source

(Auxiliary VTX) to BE1-11g terminals C17 (polarity) and C18 (non-polarity). Apply 0 Vac. OUT2
should be closed.

Step 9: Slowly increase the Auxiliary voltage until OUT2 opens (55 volts). Record the result.

Sync-Check (25) Test

BE1-11g