beautypg.com

SkyTrak 3606 Service Manual User Manual

Page 271

background image

Hydraulic System

9-77

Boom Extend/Retract Section

1. Install the poppet (24, Fig. 9– 54), spring (25) and

shuttle (21) into the boom extend/retract section
assembly (8).

2. Install a new O-ring (20) into the boom extend/retract

section assembly (8).

3. Carefully attach the boom extend/retract section

assembly (8) to the boom hoist/lower section
assembly (9) and outlet section assembly (7).

Assembling the Relief Valve Assemblies

Relief valve assembly (27, Fig. 9– 54) is oriented toward
the rear of the vehicle and is preset at 3750± 50 psi (258
± 3,5 bar). Relief valve assembly (28) is oriented toward
the front of the vehicle and is preset at 3200± 50 psi (220
± 3,5 bar).

For each relief valve assembly (27 and 28, Fig. 9– 54):

1. Install a new O-ring (29, Fig. 9– 54) and the spring

(34) into the housing (51).

2. Install a new back-up ring (32), new O-ring (31),

another new back-up ring (32), spring (33), and the
piston (52) into the housing (51).

3. Install the relief valve poppet (53), new O-ring (30),

and new back-up ring (35).

4. Install a new back-up ring (35), new O-ring (30), and

the relief valve poppet (53) into the housing (51), then
install the check valve poppet (54) into the housing
(51).

5. Place the pilot poppet (50) and spring (36) into the

housing (51), then add a new O-ring (29) and secure
with the plug (49).

6. Install jam nut (48), back-up rings (47), poppet (46),

and plug (45).

7. Use a wrench on the housing (51) to install the relief

valve assembly (27 and/or 28) into the section
assembly.

Boom Hoist/Lower Section

1. Install the anti-void assembly (26, Fig. 9– 54) into the

boom hoist/lower section assembly (9).

2. Install the poppet (24), spring (25) and shuttle (21).

3. Install a new O-ring (20), then carefully attach the

boom hoist/lower section assembly (9) to the outlet
section assembly (7).

Extend/retract and hoist/lower outlet section assembly

Install the shut-off plug assembly orifice (6, Fig. 9– 54)
into the outlet section assembly (7).

g. Main Control Valve Installation

1. Place the main control valve into position on the valve

plate assembly.

2. Align gaskets, bolt holes, etc. with component mount

holes. Secure the main control valve with the
necessary fasteners. Torque fasteners to
specification. Refer to the torque specification chart
in Section 2 General Information, Specifications and
Maintenance Instructions
.

3. Prime the main control valve by filling the inlet

openings with fresh, filtered hydraulic oil before
attaching the hoses.

4. Use new O-rings as required. Reattach and secure

all hoses, clamps, etc.

5. Check the routing of all hoses, wiring and tubing for

sharp bends or interference with any rotating
members, and install tie wraps and/or protective
conduit as required. Tighten all tube and hose
clamps.

6. Start the engine and run at approximately one-third

to one-half throttle for about one minute without
moving the vehicle or operating any hydraulic
functions.

7. Inspect for leaks and check the level of the hydraulic

fluid in the reservoir. Shut the engine OFF.

Note: Check for leaks and repair as required before con-
tinuing. Add hydraulic fluid to the reservoir as needed.

8. Conduct a pressure check of the hydraulic system in

its entirety. Adjust pressure(s) as required.

9. Wipe up any hydraulic fluid spillage in, on, near and

around the vehicle, work area and tools.

WARNING: Avoid prolonged engine operation
in closed areas with inadequate ventilation.
Failure to properly ventilate exhaust fumes can
result in death or severe personal injury.

Model 3606 • Origin 10/99