beautypg.com

Hardware installation and connection, 1 installation scenarios, 2 desktop installation procedure – ZyXEL Communications MES-2110 User Manual

Page 25: Chapter 2 hardware installation and connection

background image

MES-2110 User’s Guide

25

C

H A P T E R

2

Hardware Installation and

Connection

2.1 Installation Scenarios

This chapter shows you how to install and connect the MES-2110.

The MES-2110 can be placed on a desktop or rack-mounted on a standard EIA
rack. Use the rubber feet in a desktop installation and the brackets in a rack-
mounted installation.

Note: For proper ventilation, allow at least 4 inches (10 cm) of clearance at the front

and 3.4 inches (8 cm) at the back of the MES-2110. This is especially important
for enclosed rack installations.

2.2 Desktop Installation Procedure

1

Make sure the MES-2110 is clean and dry.

2

Set the MES-2110 on a smooth, level surface strong enough to support the weight
of the MES-2110 and the connected cables. Make sure there is a power outlet
nearby.

3

Make sure there is enough clearance around the MES-2110 to allow air circulation
and the attachment of cables and the power cord.

4

Remove the adhesive backing from the rubber feet.