Installing the mgc card, Procedure 11 installing a dsp daughterboard, Procedure 12 installing the mgc card – Nortel Networks 1000E User Manual
Page 105: Procedure 11: "installing a dsp daughterboard" on, Procedure 12: "installing the mgc card" on
Installing and connecting CS 1000E hardware
Page 105 of 466
Communication Server 1000E
Installation and Commissioning
Procedure 11
Installing a DSP Daughterboard
1
Place the MGC on a safe ESD surface.
2
Place the DSP DB in either DB position 1 (for DSP DB-96) or DB position
2 (for DSP DB-32), or both, depending on how the Daughterboards will be
configured from a TN perspective.
3
Ensure the DSP DB is securely attached to the MGC (using the four
supplied screws and standoffs).
Note: Note: Call Server dongles do not need to be retained for IPMGs.
End of Procedure
Installing the MGC card
Procedure 12
Installing the MGC card
To install the MGC card, perform the following steps:
1
Power down the Main Chassis.
2
Remove the SSC card.
3
Install the DSP Daughterboard on the MGC card as described in
Procedure 11 on
.
4
Insert the MGC into Slot 0 of the Chassis.
IMPORTANT!
You must ensure that all dongles (for both MGC and CP PM cards) are
correctly identified.
You must destroy or return the SSC dongle to your local
Nortel Repairs/Returns center.
For the CP PM call server you must use the dongle provided with the
software kit.