beautypg.com

Mportant – EXFO IQS-12004B DWDM Passive Component Test System for IQS-500 User Manual

Page 173

background image

Using the Power Meter Linearity Verification Tool

DWDM Passive Component Test System

161

Verifying Linearity on a Specific Channel

To verify linearity on a specific channel:
1.
Ensure that the acquisition parameters are properly set. For more

information, see Setting Up the Acquisition Parameters on page 158.

2. If necessary, select the channel number from which you want the

verification to start, using the up/down arrows next to the Channels:
box from the DUT panel.

Note: You don’t have to specify a channel for the reference power meter since

channel 1 always acts as the reference channel.

I

MPORTANT

Starting a new acquisition (on a new channel) will remove all
previous data from memory and will overwrite the previous results
file.
To prevent unwanted data loss, specify a new results filename and
save your report file before starting a new acquisition.

Entry zone

Browse button

DUT and reference power meter
information block

Channel to

verify

Automatic report
printing after test

Start
button

Save report