beautypg.com

EXFO IQS-12004B DWDM Passive Component Test System for IQS-500 User Manual

Page 168

background image

Using the Power Meter Linearity Verification Tool

156

IQS-12004B

Nulling Electrical Offsets

To perform a nulling:
1.
Put protective caps on power meter detectors as described in the

Instructions zone.

2. Click Nulling to start the null measurement. The nulling is performed

on all power meters at the same time.

When the operation is complete, the Start button becomes enabled
and the Instructions zone indicates that the tool is ready for linearity
verification.

Note: Once the hardware initialization is complete, you can perform a nulling at

any moment, except during an acquisition.